November 2025

How Smart Water Strategy Transforms Data Center Construction

Data CentersHiring AdvicePeople StrategyWater TechnologyCritical Infrastructure
How Smart Water Strategy Transforms Data Centre Construction

As AI-driven demand accelerates and data loads continue to grow,, many upcoming data center projects are planned in areas already facing water scarcity. Integrating a smart water strategy into the construction process can significantly influence project costs, approval timelines, and long-term operational resilience.  

Large data centers can draw millions of litres each day from cooling systems alone, and total consumption is higher when you include the water linked to electricity generation and chip manufacturing. Global estimates show data center water use running into hundreds of billions of litres a year, with some regions already feeling the pressure. 

If water design is left late, projects can face supply limits, resident opposition or expensive redesigns. 

Global failures that show the cost of weak water planning 

Across the world, data center growth is colliding with limited water supply, rising demand and closer scrutiny from regulators and communities. With AI expansion increasing cooling loads, in many regions the water footprint of a facility influences planning decisions nearly as much as land or power. 

When water modelling is shallow or cooling design mismatches regional limits, the result is conflict, delays and long-term strain on local households and businesses. This is exactly where smart water professionals make a difference; they bring the tools, data and system knowledge needed to build accurate forecasts, design smarter sourcing, integrate non-potable networks and prevent blind spots that trigger backlash.

Here is how these pressures show up in different countries:

In northern Spain a project was granted permission to withdraw more than 700 000 m³ of water each year, even though reservoirs were already low and farming depended on the same supply. Local groups argued the modelling ignored long-term decline, and residents worried about losing household access during dry months. Smart-water specialists could have flagged the downward trend earlier, strengthened modelling and helped steer the design toward reuse or non-potable supply before conflict grew. 

In Sydney, projected data-center demand could pass 100 gigalitres a year by 2035, putting pressure on a city already in long dry-period cycles. In Melbourne’s west, several proposed centres asked for volumes equivalent to those used by large suburbs. Utilities warned this could force more frequent restrictions or fast-tracked infrastructure investment. In both cities, communities voiced concern that household access would tighten as cooling loads climbed. 

These patterns emphasise the need for water engineers and smart-water specialists who understand regional hydrology, recycled-water networks, seasonal variation and long-range planning. With those skills embedded early, design can shift toward closed-loop systems, non-potable sourcing, local reuse and stronger contingency. 

In the US, a different pressure emerges: lack of transparency. Many operators do not release full water-use data, leaving utilities in states like Arizona and California uncertain about long-term capacity. These regions already face extreme heat, low rainfall and seasonal restrictions, so residents worry that hidden industrial demand will reduce household security. 

A large part of this pressure comes from evaporative cooling, still used in many US facilities. It works by passing warm air over water, causing the water to evaporate and remove heat. The process is efficient for cooling, but it consumes significant volumes because evaporated water cannot be recovered. In hot, dry states, that means data center demand peaks at the same moment households rely on the network the most. 

Smart water talent can ease these pressure points. Transparent monitoring, live reporting, digital metres, early warning analytics and stronger modelling give water authorities a clearer view of real demand. With insight, they can plan upgrades, protect treatment plants and reduce the risk that households bear the impact when cooling loads surge. 

Bringing smart water design into construction support from day one

A smart water strategy works when developed alongside core design. Early planning should account for local supply conditions, climate risks, and utility capacity constraints. These factors influence key decisions,  from cooling system selection and pipe routing to plant layout and space allocation for future upgrades. At LVI Associates ,we see a consistent pattern across global data center projects. 

Teams that bring water into early construction planning: 

  • Move through approvals faster 
  • Avoid late redesigns 
  • Keep utility engagement steady 
  • Reduce long term operating strain 

Cooling selection also shifts when water sits at the front of the conversation. In dry regions, we see more teams choosing closed-loop or hybrid systems because they reduce volume risk and support a cleaner approval path. 

Why water talent and smart water professionals matter

Data centers need two distinct skill sets to keep water systems reliable. 

Water engineers 

  • Run hydraulic modelling 
  • Design treatment systems 
  • Manage water quality and compliance 
  • Work with utilities on capacity and approvals 

They set the technical baseline that the whole system depends on. 

Smart water specialists

  • Build sensor and monitoring networks 
  • Develop digital twins 
  • Use analytics to track loads, leaks and system behaviour 
  • Give operators real time visibility 

They turn the water network into a live, data-driven system that can adapt to shifting demand. 

When both skill sets are in place, projects handle load variation cleanly, commissioning runs smoother, and reuse systems remain reliable under real operating conditions. When one side is missing, gaps usually appear once the site goes live, leading to reactive fixes, higher strain on utilities and more pressure on operations teams. 

Global pressure points in data center construction 

North America and Europe work under tight oversight from utilities and councils. Asia runs on fast build schedules that leave little room for late water design. The Middle East and parts of Africa deal with high temperatures, rapid expansion and growing stress on supply networks. Across these regions water use, regulatory pressure and community expectations keep rising, which pushes water risk higher up the construction agenda. 

This environment creates strong demand for hydrologists, water engineers, cooling specialists, construction managers, project engineers and digital water professionals. These roles support modelling, system design, cooling selection and real-time monitoring, which helps projects manage load variation and local supply limits. 

Providing water and construction data center talent

If you need support with smart water talent or data center construction talent, request a call back and we will discuss your needs in detail. We can talk through your project stage, the roles you need, the timelines involved and the best hiring options for your region.  


Data Center insights


Read more

Water technology insights


Read more